ACCA PM December 2026: Profit-Maximising Price — Why Your MR Figure Is Wrong (MR = a – 2bQ)
Profit is maximised where MR = MC. To get there in ACCA PM you need three things: the demand equation P = a – bQ, the MR equation MR = a – 2bQ, and the discipline not to round b until the very end.
What the PM examiner actually saw
The March/June 2026 PM examiner's report gave pricing two hits. In Section A, Pamirus Co asked for marginal revenue at a given output. The examiner's solution builds the demand function from scratch: find b (change in price ÷ change in quantity), find a (the price at which demand falls to zero), then double the slope for MR. The correct answer was $20 to the nearest whole dollar.
In Section C, Bamburgh Co (a new patented aeroplane engine) gave 8 marks for a table of total revenue, marginal revenue, total cost, marginal cost and profit at each price point, then asked for the profit-maximising price. The most common error? Candidates didn't build a table at all. They summed every price point into a single figure, which makes MR and MC impossible to calculate, so part (ii) collapsed with it.
The remaining 12 marks were on complementary product pricing, market skimming and price discrimination, 4 marks each. The examiner wanted the theory, application to Bamburgh, then a conclusion. Too many candidates ignored the scenario, and the report was blunt that there were no marks for suggesting an alternative strategy.
Worked example: Pamirus Co
Price $140, demand 24,000 units. Every $10 price rise cuts demand by 1,500 units. What is MR at 21,000 units?
Step 1, find b: $10 ÷ 1,500 = 1/150 = 0.006667 per unit.
Step 2, find a: demand hits zero after 24,000 ÷ 1,500 = 16 price rises of $10. So a = $140 + $160 = $300.
Step 3, demand equation: P = 300 – Q/150.
Step 4, MR equation: MR = a – 2bQ = 300 – Q/75.
Step 5, substitute: 300 – 21,000/75 = 300 – 280 = $20.
Wrong answer vs right answer
Wrong: round b to 0.0067, double it to 0.0134, then calculate 300 – (0.0134 × 21,000) = 300 – 281.4 = $18.60, which rounds to $19. Wrong option, zero marks. In an MCQ, the examiner picks distractors exactly like this.
Right: keep b as a fraction (1/150) or in full on the calculator. 2b = 1/75. 21,000 ÷ 75 = 280. MR = $20. Clean, exact, two marks.
Now take it one step further. If variable cost (MC) is $60 per unit, set MR = MC: 300 – Q/75 = 60, so Q = 18,000. Put Q back into the demand equation, not the MR equation: P = 300 – 18,000/150 = $180. Plugging Q into MR just gives you back $60, and that is the second classic error.
When there's no equation: the table method
If the question gives you a list of prices with demand and costs (as Bamburgh did), you don't need a formula. Build columns for each price: TR, MR (the change in TR), TC, MC (the change in TC) and profit. The profit-maximising price is where MC is closest to MR, which is also where profit peaks. To get full marks, state the MR and MC values at that price and explain why it's the optimum. In the CBE, use the spreadsheet so every number is a formula the marker can follow.
What to do
1. Learn the five-step routine cold: b, then a, then P = a – bQ, then MR = a – 2bQ, then MR = MC. Then put Q into the demand equation to get price.
2. Never round b. Write it as a fraction (1/150) or keep it unrounded in the spreadsheet cell. The examiner's 2026 report flagged rounding problems twice in a single sitting.
3. Pricing strategies get theory, then scenario, then conclusion. Patents point to skimming, spare parts and maintenance contracts point to complementary pricing, and different country elasticities point to price discrimination. Find the clue in the scenario and use it.
The numbers that matter
Bamburgh was a 20-mark Section C question: 8 marks for the calculation and 12 for discussion. Pamirus was 2 marks that came down to one decimal place. Pricing is tested in both sections, and it is mostly technique.
Get the slope right and you get the price right. Round it early and the calculation is wrong from Step 1.