Question 1iii
You will get this Formula Table at the exam so learn well how to apply it in your APM (P5) Exam
Iron Chicken (IC) is a multinational business which manufactures commercial building control systems. Building control systems include heating and air-conditioning systems, lighting controls, power and water monitoring and security systems (e.g. keypad access, alarms and CCTV). IC’s manufacturing takes place at a number of factory sites where some products have a long product life and are simple and mass-produced while other products are complex and have a short product life due to changing technologies. IC’s mission statement is ‘to create value for shareholders through control products which improve productivity, save energy and increase comfort and safety’.
A new chief executive officer (CEO) has been appointed to address a decline in IC’s share price in the last three years.
This CEO has identified that the business has grown through acquisition and as a result she stated, ‘senior
management have focused on making corporate deals and not making control systems.’ The CEO has declared that the business must focus on optimising its value generation rather than just getting larger through acquisitions.
You are a performance management expert within IC. The CEO has tasked you with aiding her in aspects of her improvement programme. First, she wants your views on the use of EVA™ as the key performance metric at IC. You have been supplied with the current EVA™ calculation (Appendix 1) but there is some doubt about whether the junior management accountant who has done this work was sufficiently trained in the method. So, the CEO needs you to evaluate its accuracy and the assumptions which form part of the calculation.
Second, the CEO believes that the poor performance of the company can be addressed by ensuring that the mission statement flows down into the performance management of the business. To that end, the following critical success factors (CSFs) have been identified and the CEO wants you to suggest additional key performance indicators (KPIs) for these.
CSF | Associated current KPI | |
---|---|---|
1 | Greater staff productivity | Units produced per labour hour |
2 | Reduction of wastage in production | Power consumed per unit produced |
3 | Greater innovation of products | Number of new products launched |
Your suggestions should be in addition to these current KPIs.
Third, in order to improve performance, the CEO plans to implement initiatives associated with ‘lean’ manufacturing.
Specifically, there are three projects which have been suggested and the CEO needs your advice on these:
1. Move to just-in-time manufacturing
2. Use kaizen costing
3. Examine the costs of quality in achieving a ‘zero defects’ approach to manufacturing
The CEO has stated, ‘I need to know briefly how the improvement projects will meet the three CSFs and also how they will impact on the existing three KPIs.’
Finally, the CEO requested, ‘You must tell me the implications of the improvement projects for our information systems as I feel that they are not currently suitable for the plan that I have.’ The current information systems of the company are based around the functional departments of the business such as manufacturing, marketing, finance and logistics.
Each department has developed its own system although all feed into the finance system which is the main one used for strategic decision-making. In order that the department systems can all feed through to the current finance system, these current systems only handle quantitative data. The company is considering the implementation of a new information system. This new system will introduce networking technology in order to bring together all of the departmental systems into a new, single, corporate database.
Required:
Write a report to the CEO of Iron Chicken to:
(iii) Explain what the three improvement projects are, how they will help to meet the CSFs at IC and comment on the impact of each project on the existing three KPIs. (15 marks)